Hua Hin dual-track rail project to go ahead

Local Hua Hin and regional Thailand news articles and discussion.
Post Reply
User avatar
StevePIraq
Rock Star
Rock Star
Posts: 3043
Joined: Sat Jun 28, 2008 1:21 pm
Location: Ting Tong Land

Re: Hua Hin dual-track rail project to go ahead

Post by StevePIraq »

This seems to be the most detail I can find on this

http://dc-asia.dorsch.de/projects/proje ... 70b07c694e
"Live everyday as if it were your last because someday you're going to be right." Muhammad Ali
HHTel
Hero
Hero
Posts: 10806
Joined: Mon Feb 12, 2007 7:44 pm

Re: Hua Hin dual-track rail project to go ahead

Post by HHTel »

Here is the link on the high speed project only recently approved. It's aim is China with the first section from Bangkok to Nakhon Ratchisima (4 years) and yes the HS line will be 1.435 as opposed to the dual track system which will run on the current guage.

http://shanghaiist.com/2017/07/12/thail ... proved.php
User avatar
Big Boy
Moderator
Moderator
Posts: 44949
Joined: Fri Nov 04, 2005 7:36 pm
Location: Bon Kai

Re: Hua Hin dual-track rail project to go ahead

Post by Big Boy »

Spotted on Soi 94. Can the clever people work out what it says?
rail.jpg
I see double tracks, raised tracks etc. A pipe dream, or reality?
Championship Plymouth Argyle 0 - 1 Preston NE :cry: :cry: :cry: :cry:

Points 41; Position 18
User avatar
Bamboo Grove
Moderator
Moderator
Posts: 5266
Joined: Mon Jan 13, 2003 12:59 pm
Location: Macau, China

Re: Hua Hin dual-track rail project to go ahead

Post by Bamboo Grove »

It says (the text that I can see): Construction of double track railway Nakhon Pathom - Hua Hin.
Gregjam
Ace
Ace
Posts: 1037
Joined: Wed Mar 13, 2013 9:11 pm
Location: Hua Hin

Re: Hua Hin dual-track rail project to go ahead

Post by Gregjam »

Zoomed in a bit and it started in February and scheduled to take 36 months. It will be interesting to see how close it will be to the Hua Hin golf clubhouse.
hhinner
Rock Star
Rock Star
Posts: 4289
Joined: Fri Nov 09, 2012 2:17 pm

Re: Hua Hin dual-track rail project to go ahead

Post by hhinner »

Contractor is Sino Thai. Project to run 1 Feb 2561 (i.e. last month) for 36 months. Light blue is fence line; yellow is existing track; red is new track, including elevated track.
hhinner
Rock Star
Rock Star
Posts: 4289
Joined: Fri Nov 09, 2012 2:17 pm

Re: RE: Re: Hua Hin dual-track rail project to go ahead

Post by hhinner »

Gregjam wrote:Zoomed in a bit and it started in February and scheduled to take 36 months. It will be interesting to see how close it will be to the Hua Hin golf clubhouse.
Crossed tracks with you. The fence to fence width is shown as 39.81m if that helps. How near is the clubhouse to existing track?
User avatar
Big Boy
Moderator
Moderator
Posts: 44949
Joined: Fri Nov 04, 2005 7:36 pm
Location: Bon Kai

Re: Hua Hin dual-track rail project to go ahead

Post by Big Boy »

Hmmmm....... I've just come across this artists impression on the Internet. Looks as though the existing station will be decimated and many small traders gone.

History moved over to make way for progress :?
29261962_1863412030358810_7758698269483466752_n (1).jpg
29261962_1863412030358810_7758698269483466752_n (1).jpg (44.25 KiB) Viewed 1076 times
Championship Plymouth Argyle 0 - 1 Preston NE :cry: :cry: :cry: :cry:

Points 41; Position 18
HHTel
Hero
Hero
Posts: 10806
Joined: Mon Feb 12, 2007 7:44 pm

Re: Hua Hin dual-track rail project to go ahead

Post by HHTel »

That looks like an 'impression' of the High Speed link. The original track plus the new track is virtually non existent. Pretty sure that doesn't refer to the first graphic that was posted.
oakdale160
Rock Star
Rock Star
Posts: 4657
Joined: Sat Jul 06, 2013 9:51 pm

Re: Hua Hin dual-track rail project to go ahead

Post by oakdale160 »

They say 3 years, Summer 2021 lets start a book on completion date. My entry july 1st 2025.
User avatar
Big Boy
Moderator
Moderator
Posts: 44949
Joined: Fri Nov 04, 2005 7:36 pm
Location: Bon Kai

Re: Hua Hin dual-track rail project to go ahead

Post by Big Boy »

HHTel wrote: Sun Mar 18, 2018 10:38 am That looks like an 'impression' of the High Speed link. The original track plus the new track is virtually non existent. Pretty sure that doesn't refer to the first graphic that was posted.
With an old chugger of a freight train? TIT.

I think the artist's impression shows what is left of the original station, together with the raised new station, similar to the newer stations around Bangkok.
Championship Plymouth Argyle 0 - 1 Preston NE :cry: :cry: :cry: :cry:

Points 41; Position 18
HHTel
Hero
Hero
Posts: 10806
Joined: Mon Feb 12, 2007 7:44 pm

Re: Hua Hin dual-track rail project to go ahead

Post by HHTel »

Yeh hadn't noticed the 'chugger'. However, if it's correct then the new elevated track is way over (west) from the original track. Doesn't quite look right. Time will tell.
hhinner
Rock Star
Rock Star
Posts: 4289
Joined: Fri Nov 09, 2012 2:17 pm

Re: Hua Hin dual-track rail project to go ahead

Post by hhinner »

Judging by the two graphics they're building elevated tracks and having ground level dual tracks as well. Maybe the ground level will handle trains stopping at every station while elevated is for "express" services. Which track will freight use though?
handdrummer
Addict
Addict
Posts: 5389
Joined: Mon Mar 03, 2014 11:58 am

Re: Hua Hin dual-track rail project to go ahead

Post by handdrummer »

Where will they get the hills, grass and pine trees?
hhinner
Rock Star
Rock Star
Posts: 4289
Joined: Fri Nov 09, 2012 2:17 pm

Re: Hua Hin dual-track rail project to go ahead

Post by hhinner »

Don't think hills are a problem around Hua Hin. But if the nearly 40m width is used for the entire project that's going to affect a lot of people that live quite close to the existing track. A bit skeptical that HH to Nakorn Pathom can be finished in 3 years.